The Dartmouth reports on the project, and the Planner has some closer photos. The D also had an article in July. (The Planner’s Office now has not only a blog and website but also a domain name, dartmouthplanning.com.)
Although the dock project includes bank stabilization and plantings, it continues the trend of intensified development on the east bank of the river between the bridge and the canoe club. As recently as 1985, the docks were less noticeable, the bridge was smaller, lower, and much less prominent, and the assertive boathouse was nonexistent.
Instead of maintaining the fiction that this limited site is a part of nature, could it be developed heavily, with a broad granite pedestrian corniche? Let’s promenade on the Ledyard Malecón.