The seven-year lounge

The two temporary social buildings are moving ahead (Dartmouth Now, The Dartmouth).

The building that will stand next to Davis Varsity House, House Center A, will be a one-story tensile or tensioned membrane structure built around an aluminum frame. The building will occupy a plot of 4,750 square feet. The Planning Board looked at the plans in December and its minutes contain mentions of a deck, a fire pit, and a tower (Planning Board minutes pdf). The Montshire Museum, incidentally, has a 2,400-square-foot tensile building called the Hughes Pavilion (see Eileen Herring, “Montshire Museum of Science — Not Just for Children,” New Hampshire Granite State Ambassadors; sprung.com).

House Center B will be a two-story, 6,920 square foot building behind Hitchcock (Planning Board minutes 11.03.2015 pdf). The ground level will include a snack bar (construction update pdf). The school has a video of the start of construction (not working any longer; it is linked from the OPDC Projects page).

The article in The Dartmouth states that the school eventually will build permanent additions to the dorms:

The structures are intended to be temporary so that the College can evaluate the type of spaces needed for student programming, Hogarty said. She noted that future renovations will be based on the information gathered.

“Before we move forward with [renovation], we’d like to build temporary structures with enough flexibility so students can make the space their own,” Hogarty said. “We wanted to figure out what makes a great space for students before updating the residence halls themselves.”

Leave a Reply

Your email address will not be published. Required fields are marked *