The Valley News reports that the deep excavation for the new Thayer/Computer Science building has been made in the wrong place: it is ten feet to the south of where it should be. The hole for the parking deck that will underpin the building was dug to the correct dimensions but in the wrong location.
Ignore for the moment the implications for an engineering school of this magnificent error (as well as the possibility that the excavation is in the right place but that the Town-approved documents were never updated after some design change). The article presents two options: conduct new excavations to put the building in the right place, or accept the current site and rehash the Town of Hanover approval process. The second option might be less expensive. Once it is re-approved, the planned bridge to MacLean can simply be extended by ten feet.