Jens Larson’s main or western stand at Memorial Field is a concrete grandstand screened by a brick facade overlooking Lebanon Street. The Big Green Alert Blog reports that the previously-announced Memorial Field project (construction to begin October 2008, occupancy September 2009, according to the schedule pdf) is more than just a renovation of the structure: the school will demolish the entire concrete stand and replace it with a new one, leaving the brick facade in place.
This project will make the stand more accessible, more comfortable, and less capacious. The likely drop in seating capacity, continuing the trend of the Floren-motivated shrinking of the East Stand, might be desirable. The green-paneled press box, which seems to be from the 1950s and is the latest in a series of expanding press boxes, also will be replaced. The replacement could be a harmonious brick design that responds to Floren, and if Centerbrook has a hand in the project, this result seems especially likely.
Memorial Field’s original West Stand as viewed from the head of the field, by Davis Field House. The distinction between the concrete stand and the applied brick facade or screen is evident. The replacement press box will probably be much wider.
The stand’s center bay contains the only “interior” and the only portion past the street front that is worth saving. This vaulted passage is the site of the memorial element of Memorial Field.
The concrete stand itself is utilitarian and not in the best condition.